Skip to content
US Home Costs

Kitchen & bath

Hardwood Flooring Installation Cost 2026: $4,000–$6,000

About 500 square feet of prefinished hardwood, plank and labor in one price, often clusters around $4,000–$6,000. A single room costs less. A site finish, a tear-out, and a new subfloor cost more.

Updated October 9, 2026 · 22 min read · US Home Costs editorial desk

Planning range

About 500 square feet of prefinished hardwood on one level of a single-family house, plank and labor included, nail-down or glue-down on a floor that is already flat enough. A single room, a larger floor, floating engineered, a site finish, old-floor removal the bid leaves out, a subfloor repair the bid leaves out, and stairs the bid leaves out are separate.

Typical planning range $4,000 to $6,000. National spread $600 to $22,500.

DIY or hire
Hire nail-down, glue-down, a site finish, and stairs. A rectangular floating engineered room, on a floor that is already flat, can be a careful DIY if you will cut the planks and haul the waste.
Repair or replace
Sand the solid floor you have when wood remains above the tongue. Install new hardwood when the wear layer is gone, the boards are cupped, or the floor was never wood.

Installing about 500 square feet of prefinished hardwood in a US house — nail-down or glue-down, the plank and the labor in one price, on a floor that is already flat enough — often clusters around $4,000–$6,000. That is the typical hardwood flooring installation cost. How much does hardwood flooring installation cost in that scope? It is the middle of the size row below, at $8–$12 a square foot, not the $15 top. Hardwood flooring cost, for that floor, is the same band. The cost to install hardwood floors, for that floor, is the same band. Hardwood flooring cost per square foot, installed, is typically $6–$15, and the typical band is the middle of that rate on about 500 square feet. Engineered hardwood flooring cost, for ordinary nail-down or glue-down, is that same rate. The wider national spread, about $600–$22,500, covers a 10×10 at $6 a square foot at the low end and about 1,500 square feet at $15 a square foot at the high end. Sanding a floor you keep is the hardwood floor guide. New vinyl plank is the other hard surface. New laminate is not wood. New carpet is the soft floor. These are typical planning ranges, not a survey and not a quote.

This page is new hardwood on an existing single-family floor. A bid may call it hardwood flooring installation, hardwood flooring, or a wood floor. It is not a sand-and-finish of a floor you are keeping, which is the hardwood floor guide. It is not click-lock vinyl, which is the vinyl plank flooring guide. It is not wall-to-wall carpet. Laminate is the laminate flooring guide.

The price of the floor is the plank and the labor that puts it down. Square feet are the first cut. The method is the second. A per-foot rate is a way to check a row. It is not a second bill. Price the floor you can measure.

The rows below are ways to read one job. They are not added together. The size table is prefinished hardwood at $6–$15 a square foot, plank and labor included, nail-down or glue-down, on a floor that is already flat enough. The method table is that same installed floor, by how it goes down, and it replaces the generic rate. Floating engineered replaces nail-down. It is not a second floor on top of it. A site-finished floor replaces the prefinished rate. Use an add-on row only for a line the size row does not include. A tear-out the proposal already names is not a second tear-out. A stair flight the proposal already includes is not a second flight.

FloorSquare feetTypical installed cost
10×10 room100$600–$1,500
12×12 bedroom144$864–$2,160
One larger room200$1,200–$3,000
Several rooms500$3,000–$7,500
Most of one floor1,000$6,000–$15,000
A larger floor1,500$9,000–$22,500
MethodTypical installed cost per square foot
Nail-down, prefinished$6–$15
Glue-down, prefinished$6–$15
Floating engineered$6–$14
Site-finished solid$10–$20
Add-onTypical planning range
Old floor removal, when the bid leaves it out$1–$2 per sq ft
Subfloor repair, when the bid leaves it out$900–$3,000
Stairs, about thirteen steps, when the bid leaves them out$40–$100 per tread

The method rows replace the generic rate inside the size row. Do not add glue-down on top of a size row that was already priced as nail-down. The add-on rows are lines the size row left out. A removal the proposal already includes is not the removal row on top.

A 10×10 is 100 square feet and is typically $600–$1,500. One hundred times $6 is $600, the floor of the row and the floor of the wider spread. One hundred times $15 is $1,500, the top. One hundred times $12 is $1,200, inside the row and under the typical band. The typical band is about 500 square feet. This room can land on a few hundred dollars and still be a different job from that 500 square foot floor. A crew that will not roll a truck for a closet can sit higher inside this row. It is not the typical band with a discount. From $600–$1,500 the job is the 10×10 prefinished row. Do not add the 500 square foot row on top of it.

A 12×12 bedroom is 144 square feet and is typically $864–$2,160. One hundred forty-four times $6 is $864, the floor. One hundred forty-four times $15 is $2,160, the top. One hundred forty-four times $12 is $1,728, inside the row and under the typical band. The whole row sits under $4,000. A 12×12 at the top of the rate is still one bedroom. It is not the typical band with a discount. Do not add the 10×10 row to this one.

Two hundred square feet is typically $1,200–$3,000. Two hundred times $6 is $1,200, the floor. Two hundred times $15 is $3,000, the top, and that top is $1,000 under the typical floor. Two hundred times $12 is $2,400, inside the row and under the typical band. The whole row sits under $4,000. Two hundred times $16 is $3,200, which has left the $15 rate, stays under the typical floor, and is not this row. Do not add the 12×12 row to this one.

About 500 square feet — several rooms, or one open living area of that size — is typically $3,000–$7,500 on the size row, and the typical band of $4,000–$6,000 is that row from $8 to $12 a square foot. Five hundred times $6 is $3,000, the floor of the row and $1,000 under the typical floor. Five hundred times $8 is $4,000, the typical floor. Five hundred times $12 is $6,000, the typical top. Five hundred times $15 is $7,500, the top of the row and $1,500 past the typical band. The overlap of the size row with the typical band is $4,000–$6,000. From $3,000–$4,000 the job sits under the typical band and stays inside the wider spread. From $6,000–$7,500 the job has left the typical band and stays inside the wider spread. This is the floor the typical band describes, in the middle of the rate, not at $15. Do not add a per-foot rate on top of this row. The per-foot reading is how the row was built.

About 1,000 square feet, most of one floor, is typically $6,000–$15,000. One thousand times $6 is $6,000, the floor of the row and the typical top. One thousand times $8 is $8,000, which has left the typical band by $2,000 and stays inside the row. One thousand times $12 is $12,000, inside the row. One thousand times $15 is $15,000, the top. The overlap with the typical band is the $6,000 point. From $6,000–$15,000 the job is at or above the typical top and stays inside the wider spread. Nothing in this row is 500 square feet someone doubled and then charged twice for the trip. The truck is already there. Do not add the 500 square foot row to this one.

About 1,500 square feet is typically $9,000–$22,500. Fifteen hundred times $6 is $9,000, the floor, $3,000 past the typical top. Fifteen hundred times $12 is $18,000, inside the row. Fifteen hundred times $15 is $22,500, the top of the row and the top of the wider spread. The whole row sits above the typical band. The $9,000 floor is inside the 1,000 square foot row and is still 1,500 square feet. One thousand times $9 is also $9,000. Ask which floor the bid is. Do not add the 1,000 square foot row to this one.

Hardwood flooring cost per square foot

Hardwood flooring cost per square foot is the installed floor, not the price on the box. The size rows use $6–$15 for prefinished nail-down or glue-down, plank and labor included. Material is typically $3–$9 a square foot. Labor on top of that material is typically $3–$6 a square foot. Three plus three is $6, the floor of the rate. Nine plus six is $15, the top of the rate. On 500 square feet, material at $3 and labor at $3 is $3,000. Fifteen hundred plus $1,500 is $3,000, the floor of the size row. Material at $9 and labor at $6 is $7,500. Forty-five hundred plus $3,000 is $7,500, the top of the size row. Use the split when the bid is split. Do not add those pieces on top of a size row that already includes them.

The typical band is $8–$12 on that 500 square feet, not the whole $6–$15. Five hundred times $8 is $4,000. Five hundred times $10 is $5,000, inside the typical band. Five hundred times $12 is $6,000. Five hundred times $15 is $7,500, the top of the row and $1,500 past the typical band. A quote of $6 a foot on 500 square feet is the floor of the size row and $1,000 under the typical floor. It can be a narrow prefinished oak at the bottom of the rate. It is not the typical band with a discount.

Order about a tenth more plank than the net floor, for cuts. Five hundred square feet of floor is about 550 square feet of plank. The extra 50 square feet at $3 is $150. The extra 50 at $9 is $450. Add that only when the written price is the net square feet and the waste is named as extra. On the typical band, the floor plus that waste is $4,150–$6,450. Four thousand plus $150 is $4,150. Six thousand plus $450 is $6,450. The floor stays inside the typical band. The top has left it by $450 and stays inside the 500 square foot row. An installed size row already includes a normal waste allowance. Fifty square feet on top of a row that already ordered the waste is the same plank twice.

Old floor removal, when the bid leaves it out, is typically $1–$2 a square foot. Five hundred times $1 is $500. Five hundred times $2 is $1,000. On the typical band, the floor plus that removal is $4,500–$7,000. Four thousand plus $500 is $4,500. Six thousand plus $1,000 is $7,000. The floor stays inside the typical band. The top has left it by $1,000 and stays inside the 500 square foot row, under that row’s $7,500 top. A new floor that goes over a sound existing floor the bid is leaving in place does not get this row. A removal the proposal already includes is not a second tear-out. A glued-down floor that has to be scraped can leave $2 and still stay inside the row when the rest of the job is ordinary. If the old adhesive may contain asbestos, the test and the abatement are a different project. They are not this $1–$2.

Subfloor repair, when the bid leaves a failed subfloor out, is typically $900–$3,000 for the repair, not a second price per foot of the whole floor. On the typical band, the floor plus that repair is $4,900–$9,000. Four thousand plus $900 is $4,900. Six thousand plus $3,000 is $9,000. The floor stays inside the typical band. The top has left the typical band by $3,000, has left the 500 square foot row by $1,500, and stays inside the 1,000 square foot row, under that row’s $15,000 top. A sound subfloor is not this row. A repair the proposal already includes is not a second subfloor. A soft spot the size of a closet is not a whole-floor subfloor. Price the repair the bid names. Joist replacement is a different project. It is not this $900–$3,000.

Engineered hardwood flooring cost

Engineered hardwood flooring cost is this page when the surface is real wood on a layered plank. A bid that says engineered and a bid that says solid are the same dollars when the square feet, the method, and the labor match and both sit on the $6–$15 rate. The typical band, $4,000–$6,000, is about 500 square feet of that ordinary plank, installed. It is not a second product stacked on a solid row you already have.

The cost to install hardwood floors is the installed rate when the plank and the labor are one job. Nail-down prefinished is typically $6–$15 a square foot. Glue-down prefinished is typically $6–$15. Those two methods can land on the same dollar from $6–$15. Ask which one the bid is. Glue-down takes more time on the same feet, and it can sit toward the top of that shared rate. It is not a second $6–$15 under a nail-down price. Floating engineered is typically $6–$14 and replaces the $6–$15 rate. It is not a discount taken off a nail-down row you already priced. Site-finished solid is typically $10–$20 and replaces the prefinished rate. The sanding and the coats are inside that $10–$20. They are not a second finish on top of a prefinished row.

On 500 square feet, floating engineered at $6 is $3,000, the floor of the size row and $1,000 under the typical floor. Floating at $8 is $4,000, the typical floor. Floating at $12 is $6,000, the typical top. Floating at $14 is $7,000, $1,000 past the typical band and $500 under the size-row top. The overlap with the typical band is $4,000–$6,000. From $3,000–$4,000 the floating job sits under the typical band and stays inside the wider spread. From $6,000–$7,000 it has left the typical band and stays inside the 500 square foot row. A floating floor and a nail-down floor can both land on $6,000. Ask which method the bid is. Do not add the nail-down rate under a floating price.

On 100 square feet, floating at $6 is $600, the floor of the wider spread. One hundred times $14 is $1,400, inside the 10×10 row. A floating $1,400 and a nail-down $1,400 are the same dollars and not the same method. Do not add the nail-down 10×10 row under a floating price.

A thicker wear layer and a wide plank sit toward the top of the $6–$15 rate and can leave it. They are not a second plank on top of a size row. A premium plank that leaves $15 should say so. Five hundred square feet at $20 is $10,000, which has left the 500 square foot row by $2,500 and stays inside the 1,000 square foot row, under that row’s $15,000 top. One thousand square feet at $20 is $20,000, which has left the 1,000 square foot row by $5,000 and stays inside the wider spread, under the $22,500 top. Fifteen hundred square feet at $20 is $30,000, which has cleared the wider spread by $7,500. That is a different product from the $15 row, or a floor that has picked up a subfloor or a site finish. Ask what the $20 includes before you treat it as a surcharge on a size row you already have.

Site-finished solid, on 500 square feet, at $10 is $5,000, inside the typical band. At $12 it is $6,000, the typical top. At $15 it is $7,500, the top of the size row and $1,500 past the typical band. At $20 it is $10,000, which has left the size row by $2,500 and stays inside the 1,000 square foot row. The overlap with the typical band is $5,000–$6,000. From $6,000–$7,500 the site-finished job has left the typical band and stays inside the size row. Do not add a $6–$15 prefinished row under a site-finished price. The coats are already in the $10–$20.

Stairs are not inside the flat-floor square feet. A straight flight of about thirteen steps, when the written price stopped before the flight, is typically $40–$100 a tread. Thirteen times $40 is $520. Thirteen times $100 is $1,300. On the typical band, the floor plus that flight is $4,520–$7,300. Four thousand plus $520 is $4,520. Six thousand plus $1,300 is $7,300. The floor stays inside the typical band. The top has left it by $1,300 and stays inside the 500 square foot row, under that row’s $7,500 top. A winding flight can leave $100 a tread. A flight the proposal already includes is not a second flight on top of the rooms.

What the range includes

The typical band assumes about 500 square feet of prefinished hardwood at a single-family house. The plank is in. The labor is in. The floor is already flat enough to nail or glue. Furniture, in this band, is a simple shift the owner does, or a shift the bid already names. An open 500 square feet at $8 a foot is the $4,000 floor. The same floor at $12 is the $6,000 top.

How long the work takes depends on the square feet, the cuts, the tear-out, and whether the floor is finished on site, and the bid’s schedule is the one that counts. A single room of prefinished plank is often a day or two. About 500 square feet is often a few days. A site-finished floor waits on the coats and is often longer. These are typical planning spans, not a warranty.

The floor of the wider spread, near $600, is about 100 square feet at $6. One hundred times $6 is $600. It is not 500 square feet someone discounted. The top, $22,500, is about 1,500 square feet at $15. Fifteen hundred times $15 is $22,500. It is not the 500 square foot row plus every add-on. Five hundred square feet at $6,000, removal at $1,000, and a subfloor repair at $3,000 is $10,000. Six thousand plus $1,000 plus $3,000 is $10,000. That sum has left the 500 square foot row by $2,500 and stays inside the 1,000 square foot row. Add a straight flight at $1,300 and the sum is $11,300. Ten thousand plus $1,300 is $11,300, still inside that 1,000 square foot row. Stacking those lines does not build the $22,500 job. The $22,500 job is the large floor at $15 a square foot.

None of the bands include sanding a floor you are keeping, which is the hardwood floor guide, new laminate, new vinyl plank, or new wall-to-wall carpet. A subfloor repair is the add-on row only when the bid left it out. A floor that runs through a kitchen is still this plank only for the square feet of plank. The cabinets, the counters, and the layout are a different project. Do not fold the sanding, the laminate, the vinyl, or the carpet into the hardwood price.

Warranties are part of the contract, and this page is not a reading of one company’s form. A hardwood warranty commonly splits the finish, the structure of the plank, and the installation, and the term on labor is often shorter than any term on the wood. A seam that opens, a plank that cupped because the floor was not flat or dry, and a dent the finish warranty excludes are questions for that form. Read it. The warranty is not a dollar line in the planning range.

Homeowners insurance and a home warranty are contracts too. A standard homeowners policy is built around sudden and accidental damage. A floor ruined by a covered burst pipe or a covered fire is the kind of loss those policies sometimes respond to, and the replacement is part of that claim only to the extent the form says. A floor you chose to install, and a finish that aged out, are the kind of loss those policies commonly treat as maintenance. Read the form before you treat the policy as the budget. A home warranty may name the house and still exclude floor covering. Neither contract is inside the planning range.

As a cross-check, not a bid: 500 square feet at $8–$12 is $4,000–$6,000, the typical band. Five hundred times $8 is $4,000. Five hundred times $12 is $6,000. One hundred forty-four square feet at $6–$15 is $864–$2,160, one bedroom, under that band. One thousand square feet at $8 is $8,000, inside the wider spread and above the typical band. If a bid and that reading are far apart, the bid is a larger floor, floating engineered, a site finish, a tear-out, a subfloor repair, a premium plank that left $15, or a floor the crew has to carry up a stair.

What moves the price

DriverHow it changes the bid
SizeA 10×10 is $600–$1,500. A 12×12 is $864–$2,160. Two hundred square feet is $1,200–$3,000. About 500 square feet is $3,000–$7,500, and the typical band is the middle of that row, $4,000–$6,000. About 1,000 square feet is $6,000–$15,000. About 1,500 square feet is $9,000–$22,500.
MethodNail-down prefinished is $6–$15 a square foot. Glue-down prefinished is $6–$15. Floating engineered is $6–$14 and replaces the nail-down rate. Site-finished solid is $10–$20 and replaces the prefinished rate. The method is not a second price on top of the size row.
Material and laborMaterial is $3–$9 a square foot. Labor on top of that material is $3–$6. Together they are the $6–$15 rate. A line the bid already includes is not a second line.
Removal, subfloor, stairsAll three are outside the size row when the bid leaves them out. Removal is $1–$2 a square foot. A subfloor repair is $900–$3,000. A straight flight of about thirteen steps is $40–$100 a tread. A prefinished floor over a sound subfloor, with no stairs in the scope, does not get those rows.
The plank itselfA thicker wear layer and a wide plank sit toward the top of $6–$15 and can leave it. A premium plank is not a second floor on top of a size row.
Region and accessLabor varies widely. A high-cost metro can clear the top of the typical band on a straightforward 500 square feet. An upstairs the boxes have to be carried to is labor, too.

Square feet are the first cut, and they are not a rate times the whole house if only the bedrooms are in the bid. Measure the rooms. A 12×12 at $15 is $2,160. Five hundred square feet at $6 is $3,000. The smaller, higher-rate room can cost less than the larger, cheaper one, and the gap is the square feet. The crew does not scale in a straight line from a closet, which is why a real visit often does not land under $600.

The method is the second cut, and it is a substitute, not a stack. Nail-down, glue-down, floating, and site-finished are ways to price one surface. Adding glue-down on top of a nail-down size row is how 500 square feet becomes a number nobody can compare.

The same 500 square feet in a lower-cost area and in a high-labor city can sit at opposite ends of $4,000–$6,000 without either bid being wrong. Ask whether the old floor leaves, and ask whether the plank is prefinished. A floor you can still sand, on the hardwood floor guide, vinyl plank in the rooms you are not putting wood in, and carpet in the bedrooms you are leaving soft are the projects that show up beside this one. Price them on their own pages. Two bids that disagree about the method, the tear-out, and whether the subfloor is in are not the same floor.

DIY or hire

Hire the nail-down, the glue-down, the site finish, and the stairs. The nailer, the adhesive, the sanding, and a flight of treads are the job. A weekend crew is most likely to miss the flatness and the moisture, and a nailed floor on a wavy or wet subfloor shows up as a cupped seam.

A single rectangular room, floating engineered, no stairs, on a floor that is already flat and dry, can be a careful DIY if you will cut the planks and haul the waste. That is the labor line, $3–$6 a square foot, you are not hiring. The plank is still real. On 500 square feet, material at $3–$9 is $1,500–$4,500, and labor at $3–$6 is $1,500–$3,000. Fifteen hundred and $1,500 is the $3,000 floor of the installed row. Forty-five hundred and $3,000 is the $7,500 top. A DIY that buys the $9 plank has spent $4,500 before waste, which sits inside the typical band, and has not hired the labor. It is not the $4,000–$6,000 install with a secret discount. The installed row is the pro price. A house, a flight of stairs, a nail-down, a glue-down, a site finish, and any floor that needs a subfloor repair are a hire.

Do not skip the flatness or the moisture reading to save a day. If you are pricing a sander, a leveler, and a dumpster, you are pricing a contractor’s job without the crew.

Repair or replace

Sand the solid floor you have when the color is worn and a flooring contractor confirms wood remains above the tongue. That work is the hardwood floor guide. It replaces a new floor. It is not added to a size row on this page. A new coat on a thin engineered veneer is still a floor that needs to come out.

Replace the damaged boards when the wear is one spot and you can still get the same species, thickness, and width, and the rest of the floor can stay. Price those feet as new plank. Do not add a whole-room row for a closet of boards. Twenty square feet at $6 is $120, under the wider floor of $600, because a spot that small is not the 100 square foot visit. Twenty square feet at $15 is $300, still under that floor. Fifty square feet at $15 is $750, inside the wider spread and inside the 10×10 row. One hundred square feet at $15 is $1,500, the top of the 10×10 row. If the repair quote for those feet has reached the installed row for the same feet, price a replacement of those feet instead of a patch that costs the same.

Replace the floor when the wear layer is gone across the traffic lanes, the boards are cupping because the floor got wet, or the product is a thin veneer that cannot be sanded. Leaving a cupped floor to save the $4,000–$6,000 is how the next bid is a replacement anyway, after a second trip. A soft floor you want in the bedrooms is the carpet installation guide. A click-lock floor in the same rooms is the vinyl plank flooring guide. If the same season includes either of those, they are separate scopes. Do not fold them into the hardwood price.

How long a new wear layer lasts is not a number on this page. A patched board is not a warranty that the rest of the floor will wear like new. A replacement is not a warranty that a leak will miss the subfloor. The bid’s scope is the work you bought.

How to use this number

Ask two or three installers for a written price that names the square feet, the species, whether the plank is solid or engineered, the method, whether the plank and the labor are both included, whether the old floor is removed, who moves the furniture, and what happens if the subfloor is soft. Compare about 500 square feet of prefinished hardwood, installed, with $4,000–$6,000. Compare the rooms with $600–$1,500 for a 10×10, $864–$2,160 for a 12×12, $1,200–$3,000 for 200 square feet, $3,000–$7,500 for 500, $6,000–$15,000 for 1,000, and $9,000–$22,500 for 1,500. Compare the method with $6–$15 for nail-down, $6–$15 for glue-down, $6–$14 for floating engineered, and $10–$20 for site-finished solid. Keep the plank and the labor inside the prefinished rows. Put a left-out removal at $1–$2 a square foot, a left-out subfloor repair at $900–$3,000, and a left-out straight flight at $40–$100 a tread on their own lines.

A very low bid on 500 square feet is a reason to ask whether the labor and the plank are both included, not a reason to celebrate. A quote near $600 should say a small room at the floor of the rate, not a hall and three bedrooms. A high bid should point at square feet, a tear-out, a subfloor repair, a site finish, a premium plank, stairs, access, or the labor market. Two or three local bids on the same floor, the same method, and the same tear-out are the number that matters. How this site sets the band is explained on the methodology page.

Common questions

Answers describe national planning ranges, not your house.

How much does hardwood flooring installation cost?

A typical planning range for hardwood flooring installation cost is $4,000 to $6,000 for about 500 square feet, inside a wider spread of roughly $600 to $22,500. That scope is prefinished hardwood, plank and labor included, nail-down or glue-down on a floor that is already flat enough. Five hundred square feet at $8 is the $4,000 floor. Five hundred square feet at $12 is the $6,000 top. The installed rate is $6 to $15 a square foot, and the typical band is the middle of that rate. A single room, floating engineered, a site finish, a tear-out the bid leaves out, and a subfloor repair are other lines. These are typical planning ranges, not quotes.

How much does hardwood flooring cost?

Hardwood flooring cost, for the same prefinished job, is the hardwood flooring installation cost. About 500 square feet is typically $4,000 to $6,000. About 100 square feet is typically $600 to $1,500. About 200 square feet is typically $1,200 to $3,000. About 1,000 square feet is typically $6,000 to $15,000. A bid that says hardwood flooring and a bid that says hardwood flooring installation are the same dollars when the square feet, the method, and the labor match. Laminate and vinyl plank are not that rate. These are typical planning ranges, not quotes.

How much does it cost to install hardwood floors?

The cost to install hardwood floors is the installed rate, typically $6 to $15 a square foot, when the plank and the labor are one job. About 500 square feet is $3,000 to $7,500 on that size row, and the typical band is the part from $4,000 to $6,000. Nail-down is $6 to $15. Glue-down is $6 to $15. Floating engineered is $6 to $14 and replaces that rate. A site-finished floor is $10 to $20 and replaces it. A bid that is plank only, with the labor left out, is not the installed rate. Labor left out is $3 to $6 a square foot on top of material at $3 to $9. These are typical planning ranges, not quotes.

How much does hardwood flooring cost per square foot?

Hardwood flooring cost per square foot, installed, is typically $6 to $15 for prefinished nail-down or glue-down, with the plank and the labor in that rate. Material is $3 to $9. Labor on top of that material is $3 to $6. Three plus three is $6. Nine plus six is $15. Five hundred square feet at $6 is $3,000. Five hundred square feet at $8 is $4,000, the typical floor. Five hundred square feet at $15 is $7,500. Floating engineered is $6 to $14 and replaces the $6 to $15 rate. Do not add the foot price on top of a size row that was already built from it. These are typical planning ranges, not quotes.

How much does engineered hardwood flooring cost?

Engineered hardwood flooring cost, installed, is typically $6 to $15 a square foot for nail-down or glue-down, and $6 to $14 for floating. About 500 square feet of ordinary engineered is typically $4,000 to $6,000, the same typical band as solid prefinished hardwood when the square feet and the labor match. A thicker wear layer sits toward the top of that rate and can leave it. A site-finished solid floor, at $10 to $20, is not the engineered rate. These are typical planning ranges, not quotes.

Ranges for work that often shows up in the same season as this project.