Basement Finishing Cost 2026: $30,000–$40,000 Typical
About 1,000 square feet of open-plan basement finishing, materials and labor in one price, often clusters around $30,000–$40,000. A smaller basement costs less. A bathroom or a wet basement costs more.
Updated October 10, 2026 · 21 min read · US Home Costs editorial desk
Planning range
About 1,000 square feet of an unfinished single-family basement finished as open living space, framing, insulation, drywall, ceiling, flooring, paint, basic electrical, and labor in one price, on a basement that is already dry. A smaller basement, a larger basement, three rooms, a bathroom the bid leaves out, waterproofing the basement still needs, an egress window a bedroom needs, and mold the walls still have are separate.
Typical planning range $30,000 to $40,000. National spread $15,000 to $75,000.
- DIY or hire
- Hire the electrical, the plumbing, and any egress window. Owner labor on a basement that is already dry and framed is a different product, and it is not this installed rate.
- Repair or replace
- Finish the basement when it is still concrete and already dry. Waterproof first when water is entering. Remediate mold before the new walls go up. Leave a dry, finished basement in place when the problem is one room.
Finishing about 1,000 square feet of an unfinished basement in a US house — framing, insulation, drywall, a ceiling, flooring, paint, basic electrical, and the labor in one price, as open living space on a basement that is already dry — often clusters around $30,000–$40,000. That is the typical basement finishing cost. How much does it cost to finish a basement in that scope? It is the open-plan part of the size row below, at $30–$40 a square foot, not the $50 top. Basement finishing cost per square foot, installed, is typically $30–$50, and the typical band is the open-plan part of that rate on about 1,000 square feet. The average cost to finish a basement is not a single dollar on this page. The typical band is that $30,000–$40,000. Basement remodel cost, when the basement starts unfinished and the scope matches, is the same band. The cost to finish a basement with a bathroom is that band plus a bathroom the bid left out. The wider national spread, about $15,000–$75,000, covers about 500 square feet at $30 a square foot at the low end and about 1,500 square feet at $50 a square foot at the high end. A basement that is still wet is the basement waterproofing guide. A bathroom in that basement is the bathroom remodel guide. Mold in the walls is the mold remediation guide. These are typical planning ranges, not a survey and not a quote.
This page is a first finish of an unfinished single-family basement. A bid may call it basement finishing, a basement build-out, or a basement remodel. It is not a drain and a sump, which is the basement waterproofing guide. It is not a bathroom by itself, which is the bathroom remodel guide. It is not mold removal, which is the mold remediation guide. Paint on walls that are already finished, and a new floor on a floor that is already down, are different products.
The price of the job is the materials and the labor that installs them. Square feet are the first cut. The layout is the second. A per-foot rate is a way to check a row. It is not a second bill. Price the basement you can measure. An open plan and a basement divided into three rooms are ways to build one finish. Three rooms replace the open-plan rate. They are not a second basement under an open-plan price.
The rows below are ways to read one job. They are not added together. The size table is a full finish at $30–$50 a square foot, materials and labor included, on a basement that is already dry. The layout table is that same installed basement, by how many rooms it becomes, and it replaces the generic rate. Open plan is the typical layout. Three rooms replace open plan. It is not a second finish on top of it. Use an add-on row only for a line the size row does not include. A bathroom the proposal already names is not a second bathroom. Waterproofing the proposal already names is not a second system.
| Basement | Square feet | Typical installed cost |
|---|---|---|
| A small basement | 500 | $15,000–$25,000 |
| A smaller house | 800 | $24,000–$40,000 |
| A common house | 1,000 | $30,000–$50,000 |
| A larger house | 1,200 | $36,000–$60,000 |
| A large basement | 1,500 | $45,000–$75,000 |
| Layout | Typical installed cost per square foot |
|---|---|
| Open plan | $30–$40 |
| Three rooms | $40–$50 |
| Add-on | Typical planning range |
|---|---|
| One basement bathroom, when the bid leaves it out | $10,000–$25,000 |
| Waterproofing, when the basement is still wet | $3,000–$10,000 |
| One egress window, when a bedroom needs it and the bid leaves it out | $2,000–$5,000 |
| Full-basement mold remediation, when the bid leaves it out | $6,000–$15,000 |
The layout rows replace the generic rate inside the size row. Do not add three rooms on top of a size row that was already priced as open plan. The add-on rows are lines the size row left out. A bathroom the proposal already includes is not the bathroom row on top. A basement that is already dry does not get the waterproofing row. A living space that is not a bedroom does not get the egress row. A basement with no colonized material does not get the mold row.
About 500 square feet — a small basement — is typically $15,000–$25,000. Five hundred times $30 is $15,000, the floor of the row and the floor of the wider spread. Five hundred times $40 is $20,000, inside the row and under the typical band. Five hundred times $50 is $25,000, the top, and $5,000 under the typical floor. Open plan on this basement is $15,000–$20,000. Three rooms is $20,000–$25,000 and replaces the open-plan rate. The $20,000 point is 500 square feet at $40, the open-plan top and the three-room floor. Ask which layout the bid is. The whole row sits under $30,000. A 500 square foot basement at the top of the rate is still a small basement. It is not the typical band with a discount. From $15,000–$25,000 the job is the 500 square foot row. Do not add the 1,000 square foot row on top of it.
About 800 square feet — a smaller house — is typically $24,000–$40,000. Eight hundred times $30 is $24,000, the floor. Eight hundred times $40 is $32,000, inside the typical band. Eight hundred times $50 is $40,000, the typical top. Open plan on this basement is $24,000–$32,000. The overlap of that open plan with the typical band is $30,000–$32,000. The $30,000 point is also 1,000 square feet at $30. The $32,000 point is 800 square feet at $40. Three rooms is $32,000–$40,000 and replaces the open-plan rate. That whole span sits inside the typical band. The $40,000 point is also 1,000 square feet at $40. Ask which basement the bid is. From $24,000–$30,000 the job sits under the typical floor and stays inside the row. From $30,000–$40,000 the job is inside the typical band and stays inside this row. It is not the typical 1,000 square foot band. Do not add the 500 square foot row to this one.
About 1,000 square feet — a common house basement of that size — is typically $30,000–$50,000 on the size row, and the typical band of $30,000–$40,000 is that row from $30 to $40 a square foot. One thousand times $30 is $30,000, the floor of the row and the typical floor. One thousand times $40 is $40,000, the typical top. One thousand times $50 is $50,000, the top of the row and $10,000 past the typical band. The overlap of the size row with the typical band is $30,000–$40,000. From $40,000–$50,000 the job has left the typical band and stays inside the wider spread. That span is three rooms. One thousand times $40 is $40,000, the three-room floor and the open-plan top. One thousand times $50 is $50,000, the three-room top. Ask which layout the bid is. This is the basement the typical band describes, at $30–$40 a square foot, not at $50. Do not add a per-foot rate on top of this row. The per-foot reading is how the row was built.
About 1,200 square feet is typically $36,000–$60,000. Twelve hundred times $30 is $36,000, the floor of the row and inside the typical band. Twelve hundred times $40 is $48,000, which has left the typical band by $8,000 and stays inside the row. Twelve hundred times $50 is $60,000, the top. The overlap with the typical band is $36,000–$40,000. The $40,000 point is also 1,000 square feet at $40. Ask which basement the bid is. From $40,000–$60,000 the job is at or above the typical top and stays inside the wider spread. Open plan on this basement is $36,000–$48,000. Three rooms is $48,000–$60,000 and replaces the open-plan rate. The $48,000 point is 1,200 square feet at $40. Ask which layout the bid is. Do not add the 1,000 square foot row to this one.
About 1,500 square feet is typically $45,000–$75,000. Fifteen hundred times $30 is $45,000, the floor of the row and $5,000 past the typical top. Fifteen hundred times $40 is $60,000, inside the row. Fifteen hundred times $50 is $75,000, the top of the row and the top of the wider spread. Nothing in this row sits inside the typical band. Open plan on this basement is $45,000–$60,000. Three rooms is $60,000–$75,000 and replaces the open-plan rate. The $60,000 point is 1,500 square feet at $40, and it is also 1,200 square feet at $50. Ask which basement the bid is. From $45,000–$75,000 the job is above the typical top and stays inside the wider spread. Do not add the 1,200 square foot row to this one.
Basement finishing cost per square foot
Basement finishing cost per square foot is the installed basement, not the price of drywall with no labor named. The size rows use $30–$50, materials and labor included. Open plan is $30–$40. Three rooms is $40–$50 and replaces it. The typical band uses $30–$40 on about 1,000 square feet. One thousand times $30 is $30,000, the typical floor. One thousand times $40 is $40,000, the typical top. One thousand times $50 is $50,000, the top of the 1,000 square foot row. Use the foot line when the bid is written that way. Do not add those feet on top of a size row that already includes them.
On 800 square feet, $30 a foot is $24,000, under the typical band. Eight hundred times $40 is $32,000, $2,000 into the typical band and inside the 800 square foot row. On 500 square feet, $40 a foot is $20,000, under the typical floor. On 1,200 square feet, $30 a foot is $36,000, inside the typical band, and $40 a foot is $48,000, the top of the open-plan reading on that basement. A quote of $30 a foot on 1,000 square feet is the typical floor. It is not a 1,500 square foot basement with a discount. Fifteen hundred square feet at $30 is $45,000.
A rate under $30 on a very simple open basement can land under the size row and still sit inside the wider spread. Five hundred square feet at a rate under $30 can land under the $15,000 floor of that row. Ask the square feet before you call it a bargain. A rate over $50 on a cut-up basement, or in a high-cost metro, can leave the size row. One thousand square feet at a rate over $50 is over $50,000 and can stay inside the 1,200 square foot row until it passes $60,000. Ask which basement the bid priced.
A partial finish of one room is typically $2,500–$20,000. That is one room, not this per-foot rate on the whole basement. $2,500 sits under the wider floor of $15,000. $20,000 is 500 square feet at $40, inside the 500 square foot row. A quote of $20,000 should say whether it is one room or about 500 square feet of a full finish. Do not add the partial range under a size row you already have.
Basement remodel cost
The basement remodel cost is this page when the basement starts unfinished and the finish is the whole lower level. A bid that says remodel and a bid that says basement finishing are the same dollars when the square feet, the layout, and the labor match and both sit on the $30–$50 rate. The typical band, $30,000–$40,000, is about 1,000 square feet of that open-plan finish. It is not a second product stacked on a size row you already have.
A basement that already has walls, a ceiling, and a floor is not this build-out. The $30–$50 rate is the first finish, from concrete to a room. Painting those walls, or replacing only the floor, is not a second $30–$50 under a price that already finished them. Ask which basement the bid is. Do not add a remodel allowance on top of a finish that was priced as the first one.
Cost to finish a basement with a bathroom
The cost to finish a basement with a bathroom is the finish plus a bathroom the bid leaves out. One basement bathroom, when the bid leaves it out, is typically $10,000–$25,000 on the bathroom remodel guide. That row is one bathroom of that class, installed, not a second finish. On the typical band, the basement plus that bathroom is $40,000–$65,000. Thirty thousand plus $10,000 is $40,000, the typical top. Forty thousand plus $25,000 is $65,000, which has left the 1,200 square foot row by $5,000 and sits inside the 1,500 square foot row, under that row’s $75,000 top. Thirty thousand plus $25,000 is $55,000. That sum is an open-plan floor plus the bathroom top, and it sits inside the 1,200 square foot row. Fifty thousand plus $25,000 is $75,000, the top of the wider spread. That sum is a 1,000 square foot basement at $50 a foot plus a bathroom. Fifteen hundred square feet at $50 is also $75,000. Those are the same dollars and not the same job. A bathroom the proposal already includes is not this row on top.
A half bath can land under $10,000. A luxury bath, or a bath whose drain the bathroom line did not include, can leave $25,000. Ask whether the bathroom price is in the finish. Do not add $10,000 to a proposal that already names the bathroom.
What the range includes
The typical band assumes about 1,000 square feet of open-plan basement finishing at a single-family house. The framing is in. The insulation is in. The drywall is in. The ceiling is in. The flooring is in. The paint is in. Basic electrical, outlets and lights for that living space, is in. The labor is in. Ordinary permits, in this band, are part of the installed rate. The rate that lands on $30–$40 a square foot is the rate this band uses. An open 1,000 square feet at $30 a foot is the $30,000 floor. The same basement at $40 is the $40,000 top. The basement is already dry. A bathroom is not in the band. Three rooms are not in the band.
How long the work takes depends on the square feet, the layout, and the mechanicals, and the bid’s schedule is the one that counts. These are not a day count on this page. A ceiling that is not already tall enough for a finished room is a different project. This page does not put a dollar on excavating the floor. Ask the bid to name it.
The floor of the wider spread, near $15,000, is about 500 square feet at $30 a square foot. It is not 1,000 square feet someone discounted. The top, $75,000, is about 1,500 square feet at $50. Fifteen hundred times $50 is $75,000. It is not the 1,000 square foot row plus every add-on. One thousand square feet at the typical top, $40,000, a bathroom the finish left out at $10,000, and waterproofing the basement still needed at $3,000 is $53,000. Forty thousand plus $10,000 is $50,000. Fifty thousand plus $3,000 is $53,000. That sum has left the 1,000 square foot row by $3,000 and stays inside the 1,200 square foot row, under that row’s $60,000 top. Stacking those lines does not build the $75,000 job by itself. The $75,000 job is also the large basement at $50 a square foot, with no bathroom. About 2,000 square feet at $40 is $80,000, which has left that top. Treat a number above $75,000 as more square feet, a bathroom, or a rate the $50 line does not cover, and ask which one.
None of the bands include a drain and a sump on a basement that is still wet, which is the basement waterproofing guide, often $3,000–$10,000. Thirty thousand plus $3,000 is $33,000, inside the typical band. Forty thousand plus $10,000 is $50,000, the top of the 1,000 square foot row and $10,000 past the typical top. Thirty thousand plus $10,000 is $40,000. That sum is the typical floor plus waterproofing at its top, and it is also the typical top with no waterproofing. Ask which one the bid is. A basement that is already dry does not get this row. A waterproofing price the finish proposal already includes is not a second system.
None of the bands include a bathroom, which is the bathroom remodel guide, often $10,000–$25,000 when the bid leaves it out. Forty thousand plus $25,000 plus waterproofing at $10,000 is $75,000. Forty thousand plus $25,000 is $65,000. Sixty-five thousand plus $10,000 is $75,000. That sum is the typical top, a bathroom, and waterproofing. Fifteen hundred square feet at $50 is also $75,000. Those are the same dollars and not the same job. Do not fold the bathroom or the waterproofing into the finish price.
One egress window, when a bedroom needs it and the bid leaves it out, is typically $2,000–$5,000. Thirty thousand plus $2,000 is $32,000, inside the typical band. Forty thousand plus $5,000 is $45,000, which is $5,000 past the typical top and the floor of the 1,500 square foot row. An open living space that is not a bedroom does not get this row. A window the proposal already includes is not a second window.
Full-basement mold remediation, when the bid leaves it out, is typically $6,000–$15,000 on the mold remediation guide. Thirty thousand plus $6,000 is $36,000, inside the typical band, and it is also 1,200 square feet at $30. Forty thousand plus $15,000 is $55,000, which has left the typical band by $15,000 and stays inside the 1,200 square foot row, under that row’s $60,000 top. A basement with no colonized material does not get this row. Mold the finish price already includes is not a second remediation.
The band is the installed price. A rebate is not subtracted. Read the form before you take a number off the bid. A credit you have not received is not inside the planning range. This page does not price a sale, and it does not name a percentage of the cost that comes back at resale.
Warranties are part of the contract, and this page is not a reading of one company’s form. A finishing warranty commonly splits the materials and the installation, and the term on labor is often shorter than any term on a product. A crack that telegraphs through new drywall, a floor that cupped, and a leak the workmanship warranty excludes are questions for that form. Read it. The warranty is not a dollar line in the planning range.
Homeowners insurance and a home warranty are contracts too. A standard homeowners policy is built around sudden and accidental damage. A finished room ruined by a covered burst pipe is the kind of loss those policies sometimes respond to, and the repair is part of that claim only to the extent the form says. A basement you chose to finish, and a wall that was wet before the crew arrived, are the kind of loss those policies commonly treat as maintenance. Read the form. A home warranty may name the house and still exclude a finish you added. Neither contract is inside the planning range.
As a cross-check, not a bid: 1,000 square feet at $30–$40 is $30,000–$40,000, the typical band. One thousand times $30 is $30,000. One thousand times $40 is $40,000. Five hundred square feet at $30–$50 is $15,000–$25,000, under that band. Fifteen hundred square feet at $50 is $75,000, the top of the wider spread. If a bid and that reading are far apart, the bid is a different square-foot size, three rooms, a bathroom, waterproofing, an egress window, mold, a low ceiling, or a price that left the labor out.
What moves the price
| Driver | How it changes the bid |
|---|---|
| Size | Five hundred square feet is $15,000–$25,000. About 800 square feet is $24,000–$40,000. About 1,000 square feet is $30,000–$50,000, and the typical band is the open-plan part of that row, $30,000–$40,000. About 1,200 square feet is $36,000–$60,000. About 1,500 square feet is $45,000–$75,000. |
| Layout | Open plan is $30–$40 a square foot and is the typical band on about 1,000 square feet. Three rooms is $40–$50 and replaces the open-plan rate. The layout is not a second price on top of the size row. |
| Bathroom | One basement bathroom, when the bid leaves it out, is $10,000–$25,000 on the bathroom guide. A bathroom the proposal already includes is not a second bathroom. A half bath can land under $10,000. |
| Water and mold | Waterproofing the basement still needs is often $3,000–$10,000 on the waterproofing guide. Full-basement mold the bid leaves out is $6,000–$15,000 on the mold guide. A dry basement with no colonized material does not get those rows. |
| Egress | One egress window a bedroom needs, when the bid leaves it out, is $2,000–$5,000. An open living space that is not a bedroom does not get that row. A window the proposal already includes is not a second window. |
| Ceiling and access | A simple walk-down basement with a ceiling already tall enough is the finish this page prices. A low ceiling, a bulkhead the crew has to build around, and a high-cost metro can clear the top of the typical band on a straightforward 1,000 square feet. |
Square feet are the first cut, and they are not a rate times the whole house if only part of the basement is in the design. Measure the floor the drawing names. A 500 square foot basement at $50 is $25,000. One thousand square feet at $30 is $30,000. The smaller, higher-rate basement can cost less than the larger, cheaper one, and the gap is the square feet.
The layout is the second cut, and it is a way to read one basement. Adding $40 a square foot on top of a size row that was already priced per square foot is how 1,000 square feet becomes a number nobody can compare.
The same 1,000 square feet in a lower-cost area and in a high-labor city can sit at opposite ends of $30,000–$40,000 without either bid being wrong. Ask whether a bathroom is in, and ask whether the basement is already dry. Waterproofing the walls still need, a bathroom in the same season, and mold remediation before the new drywall goes up are the projects that show up beside this one. Price them on their own pages. Two bids that disagree about the square feet, the bathroom, and whether the labor is in are not the same job.
DIY or hire
Hire the electrical, the plumbing, and any egress window. The circuits, the drains, and the permit are the job. A weekend crew is most likely to miss a wet wall and to bury a junction box, and a leak behind new drywall shows up in the baseboard.
Owner labor on a basement that is already dry and framed is a different product. It is typically $10,000–$30,000 for the materials and that labor. It is not the installed rate on this page, and it is not a 1,000 square foot hired finish. $10,000 sits under the wider floor of $15,000. $30,000 is the typical floor, and it is also 1,000 square feet at $30. Those are the same dollars and not the same job. One is owner labor. One is the installed open-plan floor. Ask which one the number is. Do not subtract $10,000 from $30,000 and call the gap a discount on a hired finish. On 1,000 square feet at $30–$40 a foot, the hired job is $30,000–$40,000. That is the labor and the materials together.
Do not skip the permit or the moisture check to save a week. If you are pricing a panel, a drain, and a wall that is still damp, you are pricing a contractor’s job without the crew. The person who finishes the basement should say what happens if the wall is wet when the drywall is supposed to go up.
Repair or replace
Leave a dry, finished basement in place when the walls are sound, the floor is tight, and the problem is one room. One stained wall is more paint on that wall. A soft run of floor is more flooring on those square feet. This page does not put a dollar on a single-wall patch. Ask the bid to name it. If the repair quote for that basement has reached the installed row for the same square feet, price a finish instead of a patch that costs the same.
Finish the basement when it is still concrete and already dry. A new finish is not a repair of one cracked ceiling tile. Leaving an unfinished basement to save the $30,000–$40,000 is a choice about the room, not a repair. A quote near $15,000 should say about 500 square feet, not a common house basement.
A basement that leaks is the basement waterproofing guide, and the finish goes in after that basement is dry. Colonized drywall, or colonized joists, is the mold remediation guide, and the new walls go up after that material is out. A bathroom is the bathroom remodel guide. New board on a room that is already framed, with no new floor and no paint, is the drywall guide. If the same season includes any of those, they are separate scopes. Do not fold them into the finish price.
How long a new finish lasts is not a number on this page. A patched wall is not a warranty that the rest of the drywall will stay tight. A finished basement is not a warranty that water will miss the wall. The bid’s scope is the work you bought.
How to use this number
Ask two or three contractors for a written price that names the square feet, whether the price is per square foot or a lump sum, whether the framing, the insulation, the drywall, the ceiling, the flooring, the paint, the basic electrical, and the labor are all included, whether a bathroom is in, whether the basement is already dry, and what happens if a bedroom needs an egress window. Compare about 1,000 square feet of open-plan basement finishing, installed, with $30,000–$40,000. Compare the basements with $15,000–$25,000 for 500 square feet, $24,000–$40,000 for 800, $30,000–$50,000 for 1,000, $36,000–$60,000 for 1,200, and $45,000–$75,000 for 1,500. Compare the rate with $30–$50 a square foot, and the typical slice with $30–$40. Keep the materials and the labor inside those rows. Put a left-out bathroom at $10,000–$25,000, left-out waterproofing at $3,000–$10,000, a left-out egress window at $2,000–$5,000, and left-out full-basement mold remediation at $6,000–$15,000, on their own lines.
A very low bid on 1,000 square feet is a reason to ask whether the labor and the materials are both included, not a reason to celebrate. A quote near $15,000 should say about 500 square feet, not a common house basement. A high bid should point at square feet, three rooms, a bathroom, waterproofing, an egress window, mold, a low ceiling, or the labor market. Two or three local bids on the same square feet, the same layout, and the same bathroom choice are the number that matters. How this site sets the band is explained on the methodology page.
Common questions
Answers describe national planning ranges, not your house.
How much does it cost to finish a basement?
A typical planning range for basement finishing cost is $30,000 to $40,000 for about 1,000 square feet of open-plan finish, inside a wider spread of roughly $15,000 to $75,000. That scope is framing, insulation, drywall, a ceiling, flooring, paint, basic electrical, and labor, on a basement that is already dry. One thousand square feet at $30 is the $30,000 floor. One thousand square feet at $40 is the $40,000 top. The installed rate on the size row is $30 to $50 a square foot, and the typical band is the open-plan part of that rate. Three rooms, a smaller basement, a larger basement, a bathroom, and waterproofing are other lines. These are typical planning ranges, not quotes.
How much does a basement remodel cost?
Basement remodel cost, when the basement starts unfinished and the scope is a full finish, is the same planning range. About 1,000 square feet of open plan is typically $30,000 to $40,000. About 500 square feet is $15,000 to $25,000 on the size row. About 800 square feet is $24,000 to $40,000. About 1,200 square feet is $36,000 to $60,000. About 1,500 square feet is $45,000 to $75,000. A basement that already has walls, a ceiling, and a floor is not this build-out. These are typical planning ranges, not quotes.
How much does basement finishing cost per square foot?
Basement finishing cost per square foot, installed, is typically $30 to $50, with the materials and the labor in that rate. Open plan is $30 to $40. Three rooms is $40 to $50 and replaces the open-plan rate. One thousand square feet at $30 is $30,000, the typical floor. One thousand square feet at $40 is $40,000, the typical top. One thousand square feet at $50 is $50,000, the top of that size row. Do not add the foot price on top of a size row that was already built from it. These are typical planning ranges, not quotes.
What is the average cost to finish a basement?
The average cost to finish a basement is not a single dollar on this page. The typical planning range is $30,000 to $40,000 for about 1,000 square feet of open-plan finish. One thousand square feet at $30 is $30,000. One thousand square feet at $40 is $40,000. Five hundred square feet at $30 is $15,000, the floor of the wider spread. Fifteen hundred square feet at $50 is $75,000, the top. A partial finish of one room is typically $2,500 to $20,000 and is not that 1,000 square foot band. These are typical planning ranges, not quotes.
How much does it cost to finish a basement with a bathroom?
The cost to finish a basement with a bathroom is the finish plus a bathroom the bid leaves out. The finish, about 1,000 square feet open plan, is typically $30,000 to $40,000. One basement bathroom, when the bid leaves it out, is typically $10,000 to $25,000 and replaces nothing in the finish price. Thirty thousand plus $10,000 is $40,000. Forty thousand plus $25,000 is $65,000. A bathroom the proposal already includes is not a second bathroom. These are typical planning ranges, not quotes.
Related cost guides
Ranges for work that often shows up in the same season as this project.
- ExteriorHow Much Does Basement Waterproofing Cost?Waterproofing the wet walls of a basement with interior drain tile and a sump often clusters around $3,000–$10,000. Exterior excavation and a full perimeter cost more.Typical planning range $3,000 to $10,000.Typical range
- Kitchen & bathHow Much Does a Bathroom Remodel Cost?A mid-range bathroom remodel that keeps the layout often clusters around $10,000–$25,000. A cosmetic refresh can be far less, and moving the toilet or shower can double the project.Typical planning range $10,000 to $25,000.Typical range
- ExteriorHow Much Does Mold Remediation Cost?Containing and removing mold from about 100 square feet of affected surface often clusters around $1,500–$3,000. A small bathroom costs less. A full basement, a crawl space, and the HVAC cost more.Typical planning range $1,500 to $3,000.Typical range
- ExteriorHow Much Does a Home Addition Cost?One ground-floor home addition, the shell and the labor in one price, often clusters around $22,000–$83,000. A 12×12 costs less. A second story costs more.Typical planning range $22,000 to $83,000.Typical range