A common attached wood deck often clusters around $10,000–$18,000. Small ground-level platforms cost less. Composite and second-story decks cost more.
Updated September 15, 2026 · 4 min read · US Home Costs editorial desk
Planning range
Attached pressure-treated wood deck, roughly 250 to 400 square feet, standard railings, a simple stair, and a straightforward footing plan.
Typical planning range $10,000 to $18,000. National spread $6,000 to $28,000.
- DIY or hire
- Experienced DIYers can build a low, simple deck where code allows. Hire footings, ledger flashing, and any deck more than a step off the ground if you have not done this before.
- Repair or replace
- Replace individual boards and tighten hardware when the frame is sound. Rebuild when posts, beams, or the ledger are rotten or the deck was built without proper footings.
Building or replacing a common attached wood deck in the US — pressure-treated framing and decking, something like 250 to 400 square feet, a simple stair and code railings — often clusters around $10,000–$18,000. The wider national spread, about $6,000–$28,000, covers a small ground-level platform at the low end and a larger or more elevated wood deck at the high end. Composite decking and second-story structures can clear that spread. This is a planning range, not a quote.
Square-foot rules of thumb are easy to misuse. A 200-square-foot deck is not half the price of a 400-square-foot deck, because footings, a ledger, a stair, and railings do not shrink in half. Price the project you can draw, not a rate you saw on a forum.
What the range includes
The typical band assumes pressure-treated posts, beams, joists, and decking; concrete footings to the local frost depth; a ledger bolted and flashed to the house where an attached deck is allowed; ordinary railings and one straight stair; and a permit. It assumes the yard is reachable by a truck and the soil will take a standard footing.
It does not include composite or PVC boards, glass or cable railings, built-in benches, lighting circuits, a roof over the deck, removal of a large existing structure that needs a dumpster of its own, or engineering stamps some cities require for a deck above a certain height. Those should be line items.
As a cross-check, not a bid: ground-level wood platforms are often discussed around $4,000–$10,000 when they are truly simple, and composite on a comparable frame is often discussed from the high teens into $40,000 once size and height grow. Ask for wood and composite as two proposals if you are deciding between them.
What moves the price
| Driver | How it changes the bid |
|---|---|
| Size and shape | More surface is more lumber. Corners, picture-frame borders, and breaks for a tree add labor faster than area. |
| Height | A deck a story up needs more bracing, longer posts, and railings that are doing real work. Footings get more serious. |
| Ledger and flashing | Attaching to the house is where decks fail. Proper flashing and the right fasteners are not the place to save. |
| Railings and stairs | A required guardrail on three sides can cost as much as a noticeable share of the decking. |
| Material | Pressure-treated is the typical band. Cedar costs more. Composite costs more and still needs a sound frame. |
| Site | Slopes, poor access, and rocky soil turn a one-day footing job into something else. |
If the deck will have a hot tub, say so at the start. The structure is designed for it or it is not. That is an engineering question, not a board upgrade.
DIY or hire
A low deck with a simple rectangle is a realistic project for someone who has framed before, can set footings to the depth the inspector wants, and will follow the current prescriptive deck guide their city uses. The ledger connection and the flashing against the house siding are the parts that cause rot in the wall. If you are unsure, hire at least that connection and the footings, and do the decking yourself.
Hire the whole job if the deck is more than a step off the ground, if it needs a beam you cannot size, or if you have not pulled a permit before. Railings are not trim. They are the safety system. A wobbly DIY railing is not a savings.
Replacing a few surface boards is ordinary DIY when the joists under them are dry and solid. Use the same thickness, leave the gaps the material requires, and do not bury a soft joist under a new board.
Repair or replace
Repair the surface when the frame is sound: replace cupped or splintered boards, tighten or replace fasteners, and reset a loose railing post if the post base is still good. Clean and recoat when the wood is intact and the water is beading poorly. That maintenance is cheaper than any of the bands on this page.
Rebuild when posts are soft at the ground, a beam is cracked or rotting, the ledger is separating from the house, joists are notched in ways that worry you, or the deck was built on blocks sitting on the soil in a climate that freezes. Covering a bad frame with new composite boards is a way to buy an expensive surface for a structure that still needs to come out.
If you did not build the deck, look underneath before you price decking. The frame is the project or it is not. A flashlight and a screwdriver into a post base will tell you more than the color of the stain.
How to use this number
Ask for bids that state the footprint, the height, the footing type, the species and size of the framing, the decking material, the railing style, and whether removal of the old deck is included. Compare wood bids with the typical band. Compare composite bids with a higher expectation, and make the contractor show the difference as an option so you can see the material versus the structure.
A very low bid on an elevated deck is a reason to ask about footing depth and ledger flashing, not a reason to celebrate. A high bid should point at height, access, railings, or composite. Two or three local bids on the same drawing are the number that matters. How this site sets the band is explained on the methodology page.
Common questions
Answers describe national planning ranges, not your house.
How much does it cost to build a wood deck?
A national planning range for a common attached pressure-treated deck of about 250 to 400 square feet is $10,000 to $18,000, inside a wider spread of roughly $6,000 to $28,000. Ground-level platforms can land lower. Elevated decks and composite decking land higher.
Is composite decking included in that range?
No. The typical range is pressure-treated wood. Composite or PVC decking on a similar frame is often discussed as a step up, commonly adding enough to push a project toward $20,000 to $40,000 depending on size and height. Get it priced as its own option.
Can I replace a few rotten deck boards myself?
Yes, if the frame underneath is solid and you can match the thickness and fasten the boards correctly. If a post base is soft, the ledger is pulling away from the house, or the railings move when you lean on them, stop and have the structure checked before you cover it with new boards.
Other guides
- Kitchen & bathHow Much Does a Bathroom Remodel Cost?A mid-range bathroom remodel that keeps the layout often clusters around $10,000–$25,000. A cosmetic refresh can be far less, and moving the toilet or shower can double the project.Typical planning range $10,000 to $25,000.Typical range
- Kitchen & bathHow Much Does a Kitchen Remodel Cost?A mid-range kitchen remodel that keeps the layout often clusters around $30,000–$55,000. A cosmetic refresh can be far less, and moving plumbing can double the project.Typical planning range $30,000 to $55,000.Typical range
- RoofingHow Much Does a Roof Replacement Cost?A straightforward asphalt shingle replacement on a single-family home often clusters around $8,500–$15,000 installed. Steep, large, or damaged roofs sit higher.Typical planning range $8,500 to $15,000.Typical range