Exterior
Pool Installation Cost 2026: $45,000–$85,000 Typical
A standard inground pool, about 15 by 30 to 16 by 32, with the shell, the dig, the plumbing, and basic equipment, often clusters around $45,000–$85,000. An above-ground pool costs less. A large concrete pool costs more.
Updated October 9, 2026 · 19 min read · US Home Costs editorial desk
Planning range
A standard rectangular inground pool, about 15 by 30 to 16 by 32, in a single-family yard: excavation, shell, plumbing, and a basic pump and filter. An above-ground pool, a plunge or semi-inground, a larger pool, a vinyl or fiberglass or concrete shell read on its own, a heater, a permit the bid leaves out, a deck, and a fence are separate.
Typical planning range $45,000 to $85,000. National spread $1,000 to $200,000.
- DIY or hire
- Hire an inground pool. The dig, the shell, the plumbing, and the bonding are the job. A kit above-ground pool on a flat yard can be a careful DIY if you will level the base and the kit is built for an owner to assemble.
- Repair or replace
- Replace a vinyl liner, or resurface concrete, when the shell is sound. Install a new pool when the shell has failed, or when the yard does not have one. Fill an old pool in when you are done swimming, and do not add that fill to a new pool the bid already excluded.
Installing a standard inground pool in a US yard — a rectangle of about 15 by 30 to 16 by 32, the ground dug, the shell in, the plumbing run, and a basic pump and filter set — often clusters around $45,000–$85,000. That is the typical pool installation cost. How much does pool installation cost in that scope? It is the middle of the size row below, not the top of the per-foot rate. The cost to build a pool of that size is the same band when the shell and the basic equipment are in the bid. Inground pool cost, for that rectangle, is that band. Above ground pool cost, installed, is typically $1,500–$7,500, and that row replaces the inground price. Pool construction cost is the inground job: the dig, the shell, the pipe, and the basic equipment. The wider national spread, about $1,000–$200,000, covers a small above-ground pool at the low end and a 20 by 40 inground at $250 a square foot at the high end. The hard surface beside the water is a concrete patio or a deck. The barrier the city wants is a fence. These are typical planning ranges, not a survey and not a quote.
This page is a swimming pool at an existing single-family house. A bid may call it pool installation, pool construction, or a new pool. It is not the slab people walk on, which is the concrete patio guide. It is not the framed platform, which is the deck building guide. It is not the barrier, which is the fence guide. A hot tub by itself, a pond, and an indoor pool in a new room are different products.
The price of the pool is the hole, the shell, the plumbing, and the equipment that makes the water swimmable. Square feet of water are the first cut. The shell is the second. A per-foot rate is a way to check a row. It is not a second bill. Price the water you can measure. A deck, a fence, and a heater are not inside the water.
The rows below are ways to read one job. They are not added together. The size table is an inground pool at $80–$250 a square foot of water, with the excavation, the shell, the plumbing, and a basic pump and filter. The material table is that same inground pool, by shell, and it replaces the size row. Vinyl, fiberglass, and concrete are three ways to price one pool. Use a situation row when the pool is above ground, or a plunge or semi-inground. Those replace the inground size row. Use an add-on row only for a line the size row does not include. A pump the proposal already names is not a second pump. A heater inside the written price is not the heater row.
| Inground pool | Square feet | Typical installed cost |
|---|---|---|
| 12×24 | 288 | $23,040–$72,000 |
| 15×30 | 450 | $36,000–$112,500 |
| 16×32 | 512 | $40,960–$128,000 |
| 18×36 | 648 | $51,840–$162,000 |
| 20×40 | 800 | $64,000–$200,000 |
| Shell | Typical installed cost |
|---|---|
| Vinyl liner | $35,000–$80,000 |
| Fiberglass | $45,000–$100,000 |
| Concrete | $50,000–$120,000 |
| Situation | Typical cost |
|---|---|
| Above-ground, installed | $1,500–$7,500 |
| Plunge or semi-inground | $7,000–$25,000 |
| Add-on | Typical planning range |
|---|---|
| Heater, when the bid leaves it out | $1,600–$5,200 |
| Permit, when the bid leaves the city fee out | $100–$300 |
The shell rows replace the size row. Do not add vinyl on top of a 16×32 that was already priced as vinyl. The situation rows replace the size row. Do not add an above-ground price under an inground price. The add-on rows are lines the size row left out. A heater the proposal already includes is not the heater row on top.
A 12×24 is 288 square feet and is typically $23,040–$72,000. Two hundred eighty-eight times $80 is $23,040, the floor. Two hundred eighty-eight times $160 is $46,080, just inside the typical band. Two hundred eighty-eight times $250 is $72,000, the top, and that top is still inside $45,000–$85,000. The overlap with the typical band is $45,000–$72,000. From $23,040–$45,000 the job sits under the typical band and stays inside the wider spread. The $72,000 top is a small pool at the top of the rate. It is not a 16×32 someone discounted. Do not add the 15×30 row on top of it.
A 15×30 is 450 square feet and is typically $36,000–$112,500. Four hundred fifty times $80 is $36,000, the floor, and that floor is $9,000 under the typical floor. Four hundred fifty times $100 is $45,000, the typical floor. Four hundred fifty times $180 is $81,000, inside the typical band. Four hundred fifty times $200 is $90,000, which has left the typical top of $85,000 by $5,000 and stays inside the size row. Four hundred fifty times $250 is $112,500, the top. The overlap with the typical band is $45,000–$85,000. From $36,000–$45,000 the job sits under the typical band. From $85,000–$112,500 it has left the typical band and stays inside the wider spread. This is a size the typical band describes, in the middle of the rate, not at $250. Do not add a per-foot rate on top of this row. The per-foot reading is how the row was built.
A 16×32 is 512 square feet and is typically $40,960–$128,000. Five hundred twelve times $80 is $40,960, the floor, $4,040 under the typical floor. Five hundred twelve times $90 is $46,080, just inside the typical band. Five hundred twelve times $160 is $81,920, inside the typical band. Five hundred twelve times $170 is $87,040, which has left $85,000 by $2,040 and stays inside the size row. Five hundred twelve times $250 is $128,000, the top. The overlap with the typical band is $45,000–$85,000. From $40,960–$45,000 the job sits under the typical band. The $40,960 floor is the $80 rate. From $85,000–$128,000 the job has left the typical band and stays inside the wider spread. The typical band is this pool, and the 15×30, in the middle of $80–$250. It is not every 16×32. A quote of $45,000 on a 16×32 should say the shell. Do not add the 15×30 row to this one.
An 18×36 is 648 square feet and is typically $51,840–$162,000. Six hundred forty-eight times $80 is $51,840, the floor, inside the typical band. Six hundred forty-eight times $130 is $84,240, still inside the typical band. Six hundred forty-eight times $140 is $90,720, which has left the typical top and stays inside the size row. Six hundred forty-eight times $250 is $162,000, the top. The overlap with the typical band is $51,840–$85,000. From $85,000–$162,000 the job has left the typical band and stays inside the wider spread. The $51,840 floor is inside the typical dollars and is still 648 square feet, not the 16×32. Nothing in this row is a 16×32 someone stretched and then charged a second trip. Do not add the 16×32 row to this one.
A 20×40 is 800 square feet and is typically $64,000–$200,000. Eight hundred times $80 is $64,000, the floor, inside the typical band. Eight hundred times $100 is $80,000, inside the typical band. Eight hundred times $110 is $88,000, which has left the typical top by $3,000 and stays inside the size row. Eight hundred times $250 is $200,000, the top of the row and the top of the wider spread. The overlap with the typical band is $64,000–$85,000. From $85,000–$200,000 the job has left the typical band. The $200,000 top is this pool at $250 a square foot. It is not the 16×32 row plus every add-on. Do not add the 18×36 row to this one.
Inground pool cost
Inground pool cost is the shell plus the work that puts it in the ground. The size rows use $80–$250 a square foot of water. That rate is the installed inground pool: excavation, shell, plumbing, and a basic pump and filter. On 450 square feet, $100 is $45,000 and $180 is $81,000. On 512 square feet, $80 is $40,960 and $250 is $128,000. The typical band is the middle of that rate on a 15×30 or a 16×32. It is not $250 on a 20×40, and it is not an above-ground kit.
Vinyl, fiberglass, and concrete replace that size row. They are not three bills. Vinyl on an ordinary inground is typically $35,000–$80,000. The $35,000 floor sits under the typical band. The $80,000 top sits inside it. The overlap with the typical band is $45,000–$80,000. From $35,000–$45,000 the vinyl job is under the typical band and stays inside the wider spread. Fiberglass is typically $45,000–$100,000. The floor is the typical floor. The $100,000 top has left the typical band by $15,000 and stays inside the 15×30 row. Concrete is typically $50,000–$120,000. The $50,000 floor is inside the typical band. The $120,000 top has left it by $35,000 and stays inside the 16×32 row, under that row’s $128,000 top. A concrete pool and a fiberglass pool can land on the same dollar inside $50,000–$85,000. Ask which shell the bid is.
A 16×32 at $80 is $40,960. That dollar is above the vinyl floor of $35,000 and under the typical floor. It can be a vinyl pool at the low end of the size row. A 12×24 at $80 is $23,040, under the vinyl floor. That small pool is the size row. It is not the vinyl total plus the size row. A quote of $35,000 should say the shell and the square feet. Thirty-five thousand dollars is the vinyl floor. Four hundred fifty times $78 is $35,100, a 15×30 under the $80 rate. Ask what the $35,000 includes before you treat it as a 16×32.
The basic pump and filter are inside the size row and inside the shell row. A second filter on a row that already names the equipment is the same equipment twice. A heater is not that equipment. Lights, a salt cell, and a cover can sit toward the top of a shell row and can leave it. They are not a second pool.
Above-ground pool cost
Above ground pool cost, installed, is typically $1,500–$7,500. That replaces the inground size row and the shell row. The $1,500 floor is above the wider floor of $1,000. The $7,500 top is far under the typical band. The whole row sits under $45,000. An above-ground pool at $7,500 and a 12×24 inground at $23,040 are not the same pool with a gap. One sits on the yard. The other is in the ground.
A small above-ground kit can sit near $1,000, the floor of the wider spread. From $1,000–$1,500 the job is under the installed above-ground row. It is a smaller product, or a kit the owner is pricing without the crew. It is not the $1,500–$7,500 install discounted. Do not add the inground rate under an above-ground price. $80 a square foot is the inground rate. It is the wrong tool on a pool that was not dug.
A plunge pool or a semi-inground pool is typically $7,000–$25,000. That also replaces the size row. The $7,000 floor overlaps the top of the above-ground row. From $7,000–$7,500 the dollars match and the pools do not. Ask which one the bid is. The $25,000 top has left the above-ground row and stays under the typical band. The whole plunge row sits under $45,000. A semi-inground at $25,000 is not a 15×30 at $36,000 with a discount. Do not add the above-ground row under the plunge row.
The deck and the fence are still other projects when the written price stopped at the pool. A concrete patio beside an above-ground pool is the patio. A deck is the deck. A fence the city requires is the fence. None of those are inside $1,500–$7,500.
Pool construction cost
Pool construction cost is the inground build. For a standard rectangle it is $45,000–$85,000, the same typical band as pool installation cost. The construction is the excavation, the shell, the plumbing, and the basic pump and filter. On a 16×32, that band is the pool from about $90 a square foot to just under $170. Five hundred twelve times $90 is $46,080. Five hundred twelve times $160 is $81,920. The dig is inside those dollars. It is not a second excavation on top of a size row that already dug the hole.
A heater, when the bid leaves it out, is typically $1,600–$5,200. Add it only when the written price is the pool and the heater is named as extra. On the typical band, the pool plus that heater is $46,600–$90,200. Forty-five thousand plus $1,600 is $46,600. Eighty-five thousand plus $5,200 is $90,200. The floor stays inside the typical band. The top has left it by $5,200 and stays inside the 15×30 row. A heater the bid already includes is not this row on top.
A permit, when the bid leaves the city fee out, is typically $100–$300. Add it only when the written price is the construction and the fee is named as extra. On the typical band, the pool plus that fee is $45,100–$85,300. Forty-five thousand plus $100 is $45,100. Eighty-five thousand plus $300 is $85,300. The floor stays inside the typical band. The top has left it by $300 and stays inside the wider spread. A high-fee city can leave $300. A permit the bid already includes is not this row.
The coping, the plaster or the liner, and the first fill of a normal inground are part of the construction the size row describes. A deck around that coping is not. A concrete patio of broom finish is that other page. A raised walk is the deck building guide. A code barrier is the fence guide. Leaving those out of the pool price is how two bids stay comparable. Folding them in, without saying so, is how one pool becomes a number nobody can read.
What the range includes
The typical band assumes a standard rectangular inground pool at a single-family house, about 15 by 30 to 16 by 32. The ground is dug. The shell goes in. The plumbing is run. A basic pump and filter are set. An open 16×32 at about $90 a square foot is just inside the $45,000 floor, because 512 times $90 is $46,080. The same pool at $160 is $81,920, inside the band. A 15×30 at $100 is the $45,000 floor exactly. The same pool at $180 is $81,000. Access, in this band, is a yard the equipment can reach. A simple shift of a few plants is the owner’s, or a shift the bid already names.
How long the work takes depends on the shell, the dig, and the weather, and the bid’s schedule is the one that counts. A vinyl liner pool is often a few weeks. A concrete pool is often longer, about six to eight weeks, because the shell is built in place. A fiberglass shell arrives in one piece and is often faster than concrete. These are typical planning spans, not a warranty.
The floor of the wider spread, near $1,000, is a small above-ground pool. It is not a 16×32 someone discounted. The top, $200,000, is a 20×40 at $250 a square foot. Eight hundred times $250 is $200,000. It is not the typical row plus every add-on. A 16×32 at $85,000, a heater at $5,200, and a permit at $300 is $90,500. Eighty-five thousand plus $5,200 plus $300 is $90,500. That sum sits inside the 15×30 row and under the top of the wider spread. Stacking those lines does not build the $200,000 job. The $200,000 job is the large pool at the top of the rate.
None of the bands include a concrete patio, a deck, or a fence. The pool and the surface you walk on are two projects. The pool and the barrier are two projects. Do not fold the patio, the deck, or the fence into the pool price.
Warranties are part of the contract, and this page is not a reading of one company’s form. A pool warranty commonly splits the shell, the equipment, and the installation, and the term on labor is often shorter than any term on a fiberglass shell. A liner that fails, a leak at a fitting, and a stain the shell warranty excludes are questions for that form. Read it. The warranty is not a dollar line in the planning range.
Homeowners insurance and a home warranty are contracts too. A standard homeowners policy is built around sudden and accidental damage. A pool damaged by a covered storm is the kind of loss those policies sometimes respond to, and the repair is part of that claim only to the extent the form says. A pool you chose to install, a liner that aged out, and a plaster that needs resurfacing are the kind of loss those policies commonly treat as maintenance. Read the form before you treat the policy as the budget. A home warranty may name the house and still exclude the pool. Neither contract is inside the planning range.
As a cross-check, not a bid: a 15×30 at $100–$180 is $45,000–$81,000, inside the typical band. Four hundred fifty times $100 is $45,000. Four hundred fifty times $180 is $81,000. A 16×32 at $80 is $40,960, under that band. A 16×32 at $250 is $128,000, above it. An above-ground install at $7,500 is the top of that other row. If a bid and that reading are far apart, the bid is a different size, a concrete shell at the top of its row, a deck, a fence, a heater, or a yard the crew has to dig by hand.
What moves the price
| Driver | How it changes the bid |
|---|---|
| Size | A 12×24 is $23,040–$72,000. A 15×30 is $36,000–$112,500. A 16×32 is $40,960–$128,000. An 18×36 is $51,840–$162,000. A 20×40 is $64,000–$200,000. The typical band is the middle of the 15×30 and the 16×32, at $45,000–$85,000. |
| Shell | Vinyl is $35,000–$80,000. Fiberglass is $45,000–$100,000. Concrete is $50,000–$120,000. The shell replaces the size row. It is not a second price on top of the square feet. |
| Above ground | An installed above-ground pool is $1,500–$7,500. A plunge or a semi-inground is $7,000–$25,000. Those readings replace the inground row. |
| Heater and permit | Both are outside the size row. Left out, a heater is $1,600–$5,200. A permit left out is $100–$300, and a high-fee city can leave $300. A line the bid already includes is not a second line. |
| The yard around it | A patio is the concrete patio guide. A raised deck is the deck guide. A barrier is the fence guide. Leaving them out of the pool price is how the bids match. |
| Region and access | Labor and the dig vary widely. A high-cost metro can clear the top of the typical band on a straightforward 16×32. Rock, a steep yard, or a crane the shell needs is labor, too. |
Square feet are the first cut, and they are not a rate times the whole yard if only the water is in the bid. Measure the water. A 12×24 at $250 is $72,000. A 16×32 at $140 is $71,680. The smaller, higher-rate pool can cost the same as the larger, cheaper one. The crew does not scale in a straight line from a wading pool, which is why a real inground visit often does not land under $23,040.
The shell is the second cut, and it is a substitute, not a stack. Vinyl, fiberglass, and concrete are three ways to price one pool. Adding concrete on top of a vinyl size row is how one hole becomes a number nobody can compare.
The same 16×32 in a lower-cost area and in a high-labor city can sit at opposite ends of $45,000–$85,000 without either bid being wrong. Ask whether the heater is in, and ask where the deck stops. A patio in the same season, a deck at the shallow end, and a fence the inspector will look for are the projects that show up beside this one. Price them on their own pages. Two bids that disagree about the shell, the heater, and whether the deck is in are not the same pool.
DIY or hire
Hire the inground pool. The excavation, the shell, the plumbing, the electrical bond, and the inspection are the job. A weekend crew is most likely to miss the grade, the pipe, or the barrier the city requires, and those are the parts that show up as a leak and a failed inspection.
A kit above-ground pool on a flat yard, with no deck and no buried pipe, can be a careful DIY if you will level the base and the kit is built for an owner to assemble. That is not the $1,500–$7,500 installed row with a secret discount. The installed row is the pro price. The kit is a different product, and it can sit near the $1,000 floor of the wider spread when the pool is small. An inground pool, a semi-inground, a steep yard, and any pool that needs a crane are a hire.
Do not dig the hole to save the excavation. If you are pricing a machine, a shell, and an inspection, you are pricing a contractor’s job without the crew.
Repair or replace
Replace the vinyl liner when the liner is worn, stained through, or leaking and the walls behind it are sound. A new liner is typically $3,000–$7,500. That replaces a new vinyl pool for those walls. It is not added to the $35,000–$80,000 vinyl row. A liner at $7,500 and a new vinyl pool at $35,000 are a repair and a replacement. If the walls have failed, a liner on a failed wall buys a season.
Resurface a concrete pool when the plaster is rough, stained, or failing and the shell is still sound. Resurfacing is typically $8,000–$10,000. That replaces a new concrete pool for that shell. It is not added to the $50,000–$120,000 concrete row. A resurface at $10,000 is a small fraction of a new concrete pool. If the shell is cracked through, a new surface is the wrong purchase.
Fill in or remove a pool you are done with. Inground removal is typically $4,000–$16,000. Above-ground removal is typically $300–$2,500. That replaces keeping the pool. It is not a new install. Add the inground removal to a new-pool price only when the written price is a new pool and an old pool is still in the yard. On the typical band, a new pool plus that removal is $49,000–$101,000. Forty-five thousand plus $4,000 is $49,000. Eighty-five thousand plus $16,000 is $101,000. The floor stays inside the typical band. The top has left it by $16,000 and stays inside the fiberglass row. A removal the bid already includes is not this line on top.
Leave the new pool when the project is the liner, the plaster, or the fence you do not have yet. A new shell does not fix a patio that pitches the wrong way, and it does not build the fence. A deck at the water is still a deck. Those are other scopes.
How long a remaining shell lasts is not a number on this page. A new liner is not a warranty that the walls will last like a new pool. A resurface is not a warranty that the soil will stop moving. The bid’s scope is the work you bought.
How to use this number
Ask two or three pool builders for a written price that names the square feet, the shell, whether the pump and filter are included, whether a heater is included, whether the permit fee is included, and what happens if the dig hits rock. Compare a standard inground of about 15 by 30 to 16 by 32, shell and basic equipment in, with $45,000–$85,000. Compare the size with $23,040–$72,000 for a 12×24, $36,000–$112,500 for a 15×30, $40,960–$128,000 for a 16×32, $51,840–$162,000 for an 18×36, and $64,000–$200,000 for a 20×40. Compare the shell with $35,000–$80,000 for vinyl, $45,000–$100,000 for fiberglass, and $50,000–$120,000 for concrete. Compare an above-ground install with $1,500–$7,500, and a plunge or semi-inground with $7,000–$25,000. Keep the dig and the basic equipment inside the inground rows. Put a left-out heater at $1,600–$5,200 and a left-out permit at $100–$300 on their own lines.
A very low bid on a 16×32 is a reason to ask whether the equipment and the dig are included, not a reason to celebrate. A quote near $1,500 should say an above-ground pool, not an inground rectangle. A high bid should point at square feet, concrete, access, a heater, a deck, a fence, or the labor market. Two or three local bids on the same water, the same shell, and the same equipment are the number that matters. How this site sets the band is explained on the methodology page.
Common questions
Answers describe national planning ranges, not your house.
How much does pool installation cost?
A typical planning range for pool installation cost is $45,000 to $85,000 for a standard inground pool, inside a wider spread of roughly $1,000 to $200,000. That scope is a rectangular inground of about 15 by 30 to 16 by 32, with the excavation, the shell, the plumbing, and a basic pump and filter. A 15 by 30 is typically $36,000 to $112,500. A 16 by 32 is typically $40,960 to $128,000. The typical band is the middle of those rows, not the $250-a-foot top. An above-ground pool is typically $1,500 to $7,500 and replaces the inground row. A heater and a permit the bid leaves out are other lines. These are typical planning ranges, not quotes.
How much does it cost to build a pool?
The cost to build a pool is the size row for the water you can measure. A 12 by 24 inground is typically $23,040 to $72,000. A 15 by 30 is typically $36,000 to $112,500. A 16 by 32 is typically $40,960 to $128,000. An 18 by 36 is typically $51,840 to $162,000. A 20 by 40 is typically $64,000 to $200,000. Those rows use $80 to $250 a square foot of water, and the typical band of $45,000 to $85,000 is the standard 15 by 30 to 16 by 32 in the middle of that rate. An above-ground pool is not that build. These are typical planning ranges, not quotes.
How much does an inground pool cost?
Inground pool cost for a standard rectangle is the typical band, $45,000 to $85,000, when the shell, the dig, the plumbing, and a basic pump and filter are one job. Vinyl on an ordinary inground is typically $35,000 to $80,000. Fiberglass is typically $45,000 to $100,000. Concrete is typically $50,000 to $120,000. Those material totals replace the size row. They are not a second shell on top of it. A 16 by 32 at $80 a square foot is $40,960, just under the typical floor. The same pool at $250 is $128,000, above the typical band. These are typical planning ranges, not quotes.
How much does an above ground pool cost?
Above ground pool cost, installed, is typically $1,500 to $7,500. That row replaces the inground price. It is not a discount on the $45,000 to $85,000 band. A small kit can sit near $1,000, the floor of the wider spread, under this row. A plunge pool or a semi-inground is typically $7,000 to $25,000, and that also replaces the inground row. The deck and the fence, if the bid stopped at the pool, are other projects. These are typical planning ranges, not quotes.
How much does pool construction cost?
Pool construction cost, for an inground pool, is the same planning range as pool installation cost. A standard rectangle is typically $45,000 to $85,000. The construction is the excavation, the shell, the plumbing, and the basic pump and filter. A deck, a fence, and a heater are not inside that construction. A heater the bid leaves out is typically $1,600 to $5,200. A permit the bid leaves out is typically $100 to $300. An above-ground install is not inground construction. These are typical planning ranges, not quotes.
Related cost guides
Ranges for work that often shows up in the same season as this project.
- ExteriorHow Much Does a Concrete Patio Cost?A plain broom-finish concrete patio, from a 10×10 through a straightforward 16×20, often clusters around $1,500–$7,000. A 12×12 sits inside that band. A stamp, pavers, and a 20×20 cost more.Typical planning range $1,500 to $7,000.Typical range
- ExteriorHow Much Does Fence Installation Cost?A common backyard privacy fence often clusters around $3,000–$8,000. A short chain-link run costs less. Longer vinyl, extra gates, and a sloped lot cost more.Typical planning range $3,000 to $8,000.Typical range
- ExteriorHow Much Does It Cost to Build a Deck?A mid-size pressure-treated or composite deck often clusters around $10,000–$28,000. A small ground-level platform costs less. Multi-level decks, extra stairs, and a full composite system cost more.Typical planning range $10,000 to $28,000.Typical range
- ExteriorHow Much Does Landscaping Cost?One basic landscaping project on a single-family yard, plants, beds, mulch, and labor in one price, often clusters around $1,200–$6,000. A small project costs less. A new installation or a large area costs more.Typical planning range $1,200 to $6,000.Typical range